MODULAR WATER STORAGE FOR HIGH-RISK FLUIDS

The Concept Tank™

1 ML–78 ML | Minimal earthworks | Operational in 1–7 weeks

The Concept Tank™ is a customisable, modular above-ground fluid storage system built from precast concrete panels and steel posts, with a multi-layer liner system and integrated Leak Detection System (LDS). The Concept Tank™ requires no major earthworks and can be reconfigured or relocated as project requirements change. Configurations range from a single 1 ML system to multi-tank farms exceeding 200 ML.

Configured to your site, not to a catalogue

Each Concept Tank™ is configured for height, footprint and design specific gravity to suit the site and fluid. The modular design allows capacity to be expanded or reduced by adding or removing panels, and the system can be relocated as project locations change. Storage can be staged, with additional systems installed as volumes grow, so capital is committed in line with production.

Individual systems range from 1 ML to 78 ML, with multi-tank configurations for higher volumes or distributed storage.

Case example: staged brine storage. A brine storage operation added four 56 ML systems and one 78 ML system over four years, installing each as volumes grew. Each system supported ongoing production and revenue before the next was committed.

Concept Tank Contour Graph 2

*table only to be used as a guide

P CT 01

Where the Concept Tank™ fits

Earthen dams involve lengthy approvals, significant construction cost and a fixed footprint, and are typically oversized because capacity cannot be adjusted after construction.

The Concept Tank™ suits sites where volume, timing or location is uncertain. It is available to buy, as a long-term rental, or as a long-term rental with a buy-out option.

Containment Certainty: end-to-end liner control and Leak Detection System

Regulated and environmentally sensitive fluids carry greater exposure. In-ground liners are difficult and costly to replace in situ. Above-ground installation makes relining a planned activity for the Concept Tanks liner crew, and keeps the system accessible for clean-outs and desludging.

Concept Tanks designs, fabricates, installs and tests every liner in-house under its own quality assurance (QA) regime, with no third-party installers. The full liner surface is spark-tested on every installation, seam samples are taken every 300 m for destructive testing, and repairs are validated on calibrated in-house equipment.

The dual-liner configuration enables the LDS, which monitors the interstitial space between the primary and secondary liners. A primary liner breach is identified before fluid reaches the ground.

P CT 02

Fluids and Application

The Concept Tank™ stores regulated and industrial liquids across seven major sectors:

Leachate Storage

Produced Water Storage

Brine Storage

Evaporation and storage.

Industrial Process Fluids Storage

Raw Water Storage

Regulatory containment and overland flow.

Potable Water storage

Food-grade liner specification for municipal and remote sites.

Data Centre Water

Cooling water supply, fire water and blowdown storage.

Best for

01 1

High volume requirements

Large water storage tanks from 1 ML– 78 ML per system, multi-tank scaling to any project requirement.

02

Tight Timelines

1–7 weeks from site-ready.

03

Regulated Fluid Storage

Leachate, produced water, brine, process fluids, raw water.

04

Constrained Sites

High groundwater, limited excavation access, proximity to waterways.

05

Uncertain Project Timelines

Fully relocatable, no stranded asset risk.

06

High Compliance Exposure

Dual liner system with end-to-end control, integrated leak detection system.

The Concept Range

Concept AST™ Concept Tank™  Concept Utility Tank™
Best for Short- to medium-term, emergency and rental storage  Large, regulated storage that may grow, shrink or move  Permanent, high-capacity storage on a tight footprint 
Capacity per system  0.6 ML–14.5 ML  1 ML–78 ML (200 ML+ multi-tank)  12 ML–70ML
Structure  Bolted steel panels  Precast concrete panels on steel posts  Lined precast concrete panels 
Construction time (after site prep)  1–6 days  1–7 weeks  3–4 months 
Structure design life  Up to 5 years, on condition  25-years+ Up to 100 years
Foundation  Earthen pad, ≥100kPa  Earthen pad Concrete ring beam 
Specific gravity  Up to 1.2 (higher on request)  Up to 1.2 (higher on request) Up to 1.2 (higher on request)
Relocatable Yes Yes No
Leak Detection System  Standard  Standard  Standard 
Solution pathway  Rapid Deployment, Adaptability  Adaptability, Rapid Deployment, Compliance Assurance  Compliance Assurance 

Technical Specification

Capacity1 ML–78 ML per system; 200 ML+ in multi-tank configurations
StructureTilt-up precast concrete panels on steel posts, with a post-tensioned cable system
LinerDual-layer liner system with conductive geotextile and Leak Detection System, specified to the fluid
Structure design life25-years+
Liner design life20 years (conditional pro rata manufacturer's warranty)
Build time1–7 weeks from site preparation completion
Construction methodPrecast panels and steel posts erected on site; liner installed and QA tested by Concept Tanks' in-house team
Specific gravityUp to 1.2 (higher on request)
FoundationHardened earthen pad with inverted conical base; no concrete foundations required.
Wind loadRegional wind speed compliant
Design standardsSee Compliance Assurance ↗
Liner QA and testingAir lance seam testing; destructive seam sampling; vacuum box testing of extrusion welds; full-surface spark testing. Hydrostatic testing available on request
RelocatableYes

Configuration Option

  • Leak Detection SystemSTANDARD
  • Custom PipeworkSTANDARD
  • BallastSTANDARD
  • SCADA System/Remote MonitoringADD - ON
  • Engineered Floating CoverADD - ON
  • Viewing PlatformADD - ON
  • Overflow WeirADD - ON
  • Bird NettingADD - ON
  • Anti-climb ProtectionADD - ON

Proven in the field

Concept Tanks has supplied fluid storage to Australia's energy sector for over 17 years. That includes nearly 200 brine systems and 30+ brine concentrate systems on CSG and onshore oil and gas sites. We manufacture in Australia and install with our own crews. That means faster mobilisation and no handover between contractors. 

A tank farm featuring four Concept Tank™ next to a large lined pond.

Scalable Brine Evaporation

An oil & gas customer experienced rapid operational growth and increasing volumes of environmentally sensitive brine, necessitating secure storage and evaporation. Unclear total storage requirements resulted in planning uncertainty. An existing dam provided...

read more
Concept Tank™ with an Engineered Floating Cover in the Pilbara

Pilbara Dust Suppression Storage

The Pilbara presented a relentless construction environment: mini-tornado whirlwinds, oppressive heat, strong winds, cyclone alerts, and high-UV exposure throughout the program. Iron ore dust, nicknamed the "Pilbara Fog", blanketed the zone continuously, intensified...

read more
Two Concept Tank™ on an Oil and Gas site in Queensland

Dynamic Brine Services

Our customer in the Oil & Gas industry required secure on-site water storage system for contaminated flowback water to avoid the chance of discharge of contaminated water, which was essential in managing costs in relation to their gas production and frack pilot...

read more

Frequently asked
questions

Common questions about the Concept Tank, Utility Tank, and Concept AST range. 

How big can a Concept Tank™ be?

Each system holds 1 ML–78 ML. Multi-tank setups take storage past 200 ML for increased fluid or staged/distributed storage.

Can a Concept Tank™ be expanded, reduced or relocated?

Yes. Add or remove panels to expand or reduce, and relocate the system as project locations or requirements change. 

How long does installation take?

1–7 weeks from site preparation completion, depending on system size. 

Does the Concept Tank™ need concrete foundations? 

No. The system sits on a hardened earthen pad with minimal earthworks. 

Can I rent a Concept Tank™? 

The Concept Tank™ is available to buy outright, as a long-term rental, or as a long-term rental with a buy-out option. See Ways We Work for every delivery and commercial option. 

What fluids can the Concept Tank™ store?

Leachate, produced water, brine, industrial process fluids, raw water and potable water, up to specific gravity (SG) 1.2 as standard and higher on request. 

Discuss your requirements

Concept Tanks delivers modular above-ground fluid storage from 1 ML to 78ML per system, scaling to 200 ML+ across multi-tank configurations. It’s operational in 1–7 weeks with no major earthworks. Reconfigure, expand, and relocate as your project moves across waste, oil and gas, mining, industrial, and water sites.  If you are storing regulated or environmentally sensitive fluids, contact us to see whether your site is suited to a Concept Tank™. Solving tomorrow's problems, today.