Summary

<p>An Oil & Gas customer needed secure on-site storage for contaminated flowback water to cut high off-site disposal costs and support frack pilot programs. Concept Tanks first supplied six Concept ASTs, then installed two permanent 9ML tanks with double liners, leak detection, and remote monitoring.</p>
<p>Despite late design changes requiring rework, the solution reduced waste costs, enabled continued operations, and reinforced the customer’s trust in Concept Tanks’ adaptability and reliability, with over 50 tanks installed to date.</p>

Our customer in the Oil & Gas industry required secure on-site water storage system for contaminated flowback water to avoid the chance of discharge of contaminated water, which was essential in managing costs in relation to their gas production and frack pilot programs.

They faced a major challenge with the costs of shipping the water produced in this project off-site and needed large-scale water storage to avoid it. The project requirements also changed consistently, requiring the solution to be adaptable.

Solutions

Initially, to address these challenges, Concept deployed six 1.4ML Concept AST™ (Above-ground Storage Tanks) as a temporary solution, which was preferred due to the project trajectory. After some time, our customer required a permanent solution, so we deployed two 9ML Concept Tank™ to the site with a double-lined system, remote level monitoring, and leak detection systems to ensure no leaks to grade.

These tanks were installed with custom pipework that was later revised and aligned with the customer’s specific spec. Reworks were required due to project changes, showing how dynamic the solution is.

Outcomes

These tanks allowed our customer to continue their frack pilot program without the major cost of transporting the contaminated fluid offsite to the nearest storage location. It further reduced the waste disposal costs through the evaporation promotion that the Concept Tank creates.

This project reinforced the customer's trust in Concept Tanks, with 50+ other tanks installed by Concept up to that point. This project also showed Concept’s agility as a fluid storage provider by adapting to the multiple stages throughout the project’s life. Since this project, Concept has removed the last AST™, and the two 9ML tanks are operational.