The Concept Tanks Range
0.6 ML–78 ML PER TANK | INSTALLED IN 1 DAY TO 7 WEEKS | 400+ TANKS SINCE 2009
Large-Scale Fluid Storage Tanks
The conventional answer has been an earthen dam or in-ground pond, with lengthy approvals, extended construction, and a closure liability that is costly to remediate.
Concept Tanks manufactures engineered above-ground fluid storage systems that deliver the same capacity but faster, with minimal earthworks and with solutions that are relocatable and scalable for future use.
The right Concept Tank system depends on fluid volume, fluid chemistry and storage duration.

The problem with dams, ponds and in-ground reservoirs
Earthen dams and in-ground ponds require a long-term commitment before construction begins. Approvals can extend over several years, earthworks programs are substantial, and capacity is typically oversized to allow for future generation and worst-case events. Once built, the footprint is fixed for the life of the site.
Liner performance in older in-ground storage varies, and in-situ relining is slow and costly. Many existing ponds were built to standards that have since been superseded by current environmental requirements.

The above-ground alternative
The Concept AST™ requires only an earthen pad and installs in 1 to 6 days. The Concept Tank™ uses the same pad and installs in 1 to 7 weeks. Each system is sized to current requirements, and both can be dismantled and relocated.
Concept Tanks fabricates, welds and spark-tests every liner in-house, with quality assurance (QA) records available for environmental audits.
Three tanks, three different jobs
Send us the volume, fluid, site conditions and the date you need it operational.

Concept Tank™
1 ML–78 ML per system, 200 ML+ multi-tank farms | Operational in 1–7 weeks | Reconfigure and relocate
Precast concrete panels on steel posts, with a multi-layer liner system and integrated Leak Detection System (LDS) as standard. Capacity changes by adding or removing panels, and the system can be rebuilt on a new site. Storage can be staged, with additional systems installed as volumes grow. Suited to leachate, produced water, brine, process fluids, and raw and potable water.

Concept AST™
0.6 ML–14.5 ML per system | Installed in 1–6 days | No concrete foundations
Prefabricated steel panels bolted together on a 100 kPa earthen pad, lined and commissioned within a week of pad completion. At project end, the system demobilises and relocates to the next site. Designed for temporary, rental and emergency storage of potable water, wastewater and leachate.

Concept Utility Tank™
1 ML–70 ML per system | Built in 3–4 months | 100-year design life
A permanent above-ground system for long-term storage. High-wall, compact-diameter precast concrete with a liner specified to the fluid, installed with minimal earthworks. Designed as fixed infrastructure for water utilities, mining and industrial sites where storage is required for the life of the asset.
Compare the Concept Tanks Range
| Concept AST™ | Concept Tank™ | Concept Utility Tank™ | |
| Best for | Short- to medium-term, emergency and rental storage | Large, regulated storage that may grow, shrink or move | Permanent, high-capacity storage on a tight footprint |
| Capacity per tank | 0.6 ML–14.5 ML | 1 ML–78 ML (200 ML+ multi-tank) | 12-78ML |
| Structure | Bolted steel panels | Precast concrete panels on steel posts | Lined precast concrete panels |
| Construction time (after site prep) | 1–6 days | 1–7 weeks | 3-4 Months |
| Structure design life | 5+ years, on condition | Up to 25 years | Up to 100 years |
| Specific gravity | 1.0–1.2 (higher on request) | Up to 1.2 (higher on enquiry) | To confirm |
| Relocatable | Yes | Yes | No |
| Leak Detection System | Standard | Standard | No |
| Solution pathway | Rapid Deployment, Adaptability | Adaptability, Rapid Deployment, Compliance | Compliance / Assurance |
Which tank do you need?
Start with the situation, and the tank follows.
Concept AST™
If volumes are growing, the site or timeline may move, or the licence conditions are tight:
Read More ↗
Concept Tank™
If the storage is permanent, the footprint is tight, and the asset has to last the life of the site:
Read More ↗
Concept Utility Tank™
Most enquiries start with a fluid, a volume and a rough date. That's enough for us to tell you which system fits, and to say so plainly if it's one of the other two.
Read More ↗
Common to every Concept System
Structure varies across the range; containment does not. Concept Tanks designs, fabricates, installs and QA-tests its own liners in-house.
Every seam is air-lance tested, and the full liner surface is spark-tested, with destructive seam sampling. The same QA regime applies whether a system is in service for six months or for 100 years.
Above-ground installation makes relining a planned activity for the Concept Tanks liner crew and keeps each system accessible for clean-outs and desludging. The Leak Detection System (LDS) operates on a dual-liner configuration, identifying a primary liner breach before any release to ground. Every system is designed to regional wind loads, with custom pipework and ballast as standard.
Add-ons
- Leak Detection System
- Engineered Floating Covers
- SCADA Monitoring
- Custom Pipework
- Viewing Platforms
- Overflow Weirs
Built for regulated fluids in sensitive environments
Australian industry stores some of its most demanding fluids in sensitive environments and under close regulatory scrutiny:

Oil & Gas
Produced water and high total dissolved solids (TDS) brine across expanding coal seam gas fields

Mining
Mine-affected water, tailings relief, and tailings decant through changing pit plans

Waste & Landfill
Leachate and per- and polyfluoroalkyl substances (PFAS) obligations that tighten with each licence review

Utilities & Water
Secure potable and treated water storage on constrained sites

Industrials
Complex process fluids and contaminated water from legacy site remediation

Digital Infrastracture
Cooling water supply, fire water and blowdown storage, where water security & rapid build programs drive site selection

Oil & Gas
Produced water and high total dissolved solids (TDS) brine across expanding coal seam gas fields

Mining
Mine-affected water, tailings relief, and tailings decant through changing pit plans

Waste & Landfill
Leachate and per- and polyfluoroalkyl substances (PFAS) obligations that tighten with each licence review

Utilities & Water
Secure potable and treated water storage on constrained sites

Industrials
Complex process fluids and contaminated water from legacy site remediation

Digital Infrastracture
Cooling water supply, fire water and blowdown storage, where water security & rapid build programs drive site selection
Frequently asked
questions
Common questions about the Concept Tank, Utility Tank, and Concept AST range.
What's the difference between the three systems?
Duration and scale. The Concept AST™ is bolted steel for short-term storage and is designed to be moved. The Concept Tank™ is a modular concrete that can be expanded, reduced or relocated over a 25-year structural life. The Concept Utility Tank™ is permanent concrete with a 100-year design life.
Do I need concrete foundations?
Not for the Concept AST™ or the Concept Tank™. The the Concept Tank™ and the Concept AST™ sit on a hardened earth pad. The Concept Utility Tank™ needs a concrete ring beam.
Can I rent a system rather than buy one?
The Concept AST™ is available to buy, rent, or rent with a buy-out option, and is often rented for emergency requirements. The Concept Tank™ is available to buy, as a long-term rental, or as a long-term rental with a buy-out option. The Concept Utility Tank™ is purchase only. See Ways We Work for every delivery and commercial option.
Discuss your requirements
Tell us the fluid, the volume and when you need it. We'll tell you which tank fits your project. Solving tomorrow's problems, today.

