FLEXIBLE ENGINEERED FLUID STORAGE
The Concept AST™
0.6 ML–14.5 ML per system | No concrete foundations | Installed in 1–6 days
The Concept AST™ (Above-ground Steel Tank) is designed for short- to medium-term fluid storage. Prefabricated steel panels bolt together on an earthen pad, and the system is lined with a multi-layer geomembrane and commissioned within 1 to 6 days. At project end, it demobilises and redeploys with minimal site rehabilitation.
The Concept AST™ delivers engineered containment across oil and gas, waste, mining, industrial and data centre sites, without committing capital to permanent infrastructure.
Built for speed and flexibility
Prefabricated steel panels are delivered to site and bolted together using a telehandler. Construction is typically complete within 1 to 6 days of pad preparation, depending on system size, with no concrete, piling or long lead times.
A dual-geomembrane liner is standard, with a single liner available on request, installed and tested by the Concept Tanks liner team under its quality assurance (QA) regime. The earthen pad replaces a concrete slab, reducing both site preparation and end-of-life remediation.
The same system can be demobilised and reinstalled at the next site, suiting phased projects and changing storage demand
See also: Adaptability ↗


Where the Concept AST™ fits
Not every project justifies permanent infrastructure. Earthen dams, excavated ponds and concrete reservoirs require extended approvals, significant capital and a fixed footprint before any storage is available. For temporary or uncertain requirements, that means long lead times and a remediation liability at project end.
The Concept AST™ is available to buy, rent, or rent with a buy-out option.
See also: Rapid Deployment ↗
Containment Certainty: end-to-end liner control and Leak Detection System
In-ground liners are difficult and costly to replace in situ. Above-ground installation makes relining a planned activity for the Concept Tanks liner crew, and keeps the system accessible for clean-outs and desludging.
Concept Tanks designs, fabricates, installs and QA-tests every liner in-house, with no third-party installers. The full liner surface is spark-tested on every installation, seam samples are taken for destructive testing, and repairs are validated on calibrated in-house equipment.
The dual-liner configuration enables the Leak Detection System (LDS), which monitors the interstitial space between the primary and secondary liners. A primary liner breach is identified before fluid reaches the ground.
See also: Compliance Assurance ↗

Fluids and Application
The Concept AST™ stores regulated and industrial liquids across five major sectors:
Potable Water
Remote sites, camps and temporary supply
Wastewater
Buffering ahead of treatment or disposal
Leachate
Interim and wet-weather storage
Emergency Storage
Response to wet-weather events and infrastructure failure
Data Centre Water
Construction and commissioning water, temporary fire water and contingency cooling water supply
Best for
Rapid installation is required.
large water storage tanks from 1 ML– 78 ML per system, multi-tank scaling to any project requirement
Tight Timelines
1–7 weeks from site-ready
Regulated Fluid Storage
leachate, produced water, brine, process fluids, raw water
Constrained Sites
High groundwater, limited excavation access, proximity to waterways.
Uncertain Project Timelines
fully relocatable, no stranded asset risk
High Compliance Exposure
dual liner system with end-to-end control, integrated leak detection system
The Concept Range
| Concept AST™ | Concept Tank™ | Concept Utility Tank™ | |
| Best for | Short- to medium-term, emergency and rental storage | Large, regulated storage that may grow, shrink or move | Permanent, high-capacity storage on a tight footprint |
| Capacity per system | 0.6 ML–14.5 ML | 1 ML–78 ML (200 ML+ multi-tank) | 12 ML–70ML |
| Structure | Bolted steel panels | Precast concrete panels on steel posts | Lined precast concrete panels |
| Construction time (after site prep) | 1–6 days | 1–7 weeks | 3–4 months |
| Structure design life | Up to 5 years, on condition | 25-years+ | Up to 100 years |
| Foundation | Earthen pad, ≥100kPa | Earthen pad | Concrete ring beam |
| Specific gravity | Up to 1.2 (higher on request) | Up to 1.2 (higher on request) | Up to 1.2 (higher on request) |
| Relocatable | Yes | Yes | No |
| Leak Detection System | Standard | Standard | Standard |
| Solution pathway | Rapid Deployment, Adaptability | Adaptability, Rapid Deployment, Compliance Assurance | Compliance Assurance |
The Concept Range
|
Capacity
|
Diameter
|
Wall height
|
| 0.6 ML | 21 m | 1.80 m |
| 1.1 ML | 28 m | 1.80 m |
| 1.4 ML | 24.4 m | 3.00 m |
| 4.6 ML | 42 m | 3.450 m |
| 5.2 ML | 42 m | 3.670 m |
| 6.1 ML | 45.50 m | 3.670 m |
| 7.1 ML | 49 m | 3.670 m |
| 9.8 ML | 70 m | 2.450 m |
| 14.5 ML | 70 m | 3.670 m |
Technical Specification
| Capacity | 0.6 ML–14.5 ML per system (21–70m diameter) |
|---|---|
| Structure | Prefabricated bolted steel panels |
| Liner | Multi-layer geomembrane liner with conductive geotextile and Leak Detection System as standard; single liner available on request |
| Structure design life | Up to 5 years |
| Liner design life | 20 years (conditional pro rata manufacturer's warranty) |
| Build time | 1–6 days depending on asset size (after site preparation) |
| Construction method | Prefabricated steel panels bolted together on site; liner installed and QA tested by Concept Tanks’ in-house team; telehandler required on site; trailer-deployable and runs off-grid |
| Specific gravity | Up to 1.2 (higher on request) |
| Foundation | Hardened earthen pad with inverted conical base. |
| Wind load | Regional wind speed compliant |
| Design standards | See Compliance Assurance ↗ |
| Liner QA and testing | Air lance seam testing; destructive seam sampling; vacuum box testing of extrusion welds; full-surface spark testing. Hydrostatic testing available on request |
| Relocatable | Yes. Demobilisation takes 1-3 days |
Configuration Option
- Leak Detection SystemSTANDARD
- Custom PipeworkSTANDARD
- BallastSTANDARD
- SCADA System/Remote MonitoringADD - ON
- Engineered Floating CoverADD - ON
- Viewing PlatformADD - ON
- Overflow WeirADD - ON
- Bird NettingADD - ON
- Anti-climb ProtectionADD - ON
Proven in the field
Concept Tanks has supplied fluid storage to Australia's energy sector for over 17 years. That includes nearly 200 brine systems and 30+ brine concentrate systems on CSG and onshore oil and gas sites. We manufacture in Australia and install with our own crews. That means faster mobilisation and no handover between contractors.
Rapid Remediation Fluid Storage
Remediation runs on a simple sequence. Treating contaminated earth includes treating contaminated groundwater. You can’t start treating contaminated groundwater without suitable storage. Storage sits on the critical path of remediation projects where downstream...
Rethinking Frac Fluid Storage In Australia
Frac water management is logistically complex. Remote sites, variable conditions, and strict project schedules mean any delay in water delivery can increase standby costs and disrupt operations. A recent project required 14.5ML of temporary storage capacity for a...
Dynamic Brine Services
Our customer in the Oil & Gas industry required secure on-site water storage system for contaminated flowback water to avoid the chance of discharge of contaminated water, which was essential in managing costs in relation to their gas production and frack pilot...
Frequently asked
questions
Common questions about the Concept Tank, Utility Tank, and Concept AST range.
What sizes does the Concept AST™ come in?
Standard sizes run from 0.6ML to 14.5ML per system: 0.6, 1.1, 1.4, 4.6, 5.2, 6.1, 7.1, 9.8, and 14.5ML.
How long does a Concept AST™ take to install?
Construction is typically complete within 1–6 days of civil pad preparation, depending on system size. Systems up to 4.6 ML can be holding fluid in under 2 days.
Does the Concept AST™ need concrete foundations?
No. The system sits on a hardened earthen pad with a bearing capacity of at least 100 kPa. No concrete, no piling.
Can the Concept AST™ be relocated?
Yes. When the project ends, the system demobilises and redeploys at the next site with minimal site rehabilitation.
Can I rent a Concept AST™ rather than buy one?
Yes. The Concept AST™ is available to buy, rent, or rent with a buy-out option. Renting suits short-term, emergency and stop-gap storage: when the job ends, the system demobilises and goes back. See Ways We Work for every delivery and commercial option.
What fluids can the Concept AST™ store?
Potable water, wastewater, leachate and emergency water, with a specific gravity of 1.0–1.2. We can accommodate higher SG on request.
Discuss your requirements
Concept AST™ delivers fully engineered steel water storage tanks from 0.6 ML to 14.5 ML. Installed in 1–6 days on a hardened earth pad with no concrete foundations. Demobilise, relocate, and redeploy as your project evolves across oil and gas, waste, mining, and industrial sites.
If you are evaluating flexible fluid storage for your site, contact us to see whether it is technically suitable for a Concept AST™. Solving tomorrow’s problems, today.




