MODULAR WATER STORAGE FOR HIGH-RISK FLUIDS
The Concept Tank™
1 ML–78 ML | Minimal earthworks | Operational in 1–7 weeks
The Concept Tank™ is a customisable, modular above-ground fluid storage system built from precast concrete panels and steel posts, with a multi-layer liner system and integrated Leak Detection System (LDS). The Concept Tank™ requires no major earthworks and can be reconfigured or relocated as project requirements change. Configurations range from a single 1 ML system to multi-tank farms exceeding 200 ML.
Configured to your site, not to a catalogue
Each Concept Tank™ is configured for height, footprint and design specific gravity to suit the site and fluid. The modular design allows capacity to be expanded or reduced by adding or removing panels, and the system can be relocated as project locations change. Storage can be staged, with additional systems installed as volumes grow, so capital is committed in line with production.
Individual systems range from 1 ML to 78 ML, with multi-tank configurations for higher volumes or distributed storage.
Case example: staged brine storage. A brine storage operation added four 56 ML systems and one 78 ML system over four years, installing each as volumes grew. Each system supported ongoing production and revenue before the next was committed.
Read more:Scalable Brine Evaporation ↗

*table only to be used as a guide

Where the Concept Tank™ fits
Earthen dams involve lengthy approvals, significant construction cost and a fixed footprint, and are typically oversized because capacity cannot be adjusted after construction.
The Concept Tank™ suits sites where volume, timing or location is uncertain. It is available to buy, as a long-term rental, or as a long-term rental with a buy-out option.
Containment Certainty: end-to-end liner control and Leak Detection System
Regulated and environmentally sensitive fluids carry greater exposure. In-ground liners are difficult and costly to replace in situ. Above-ground installation makes relining a planned activity for the Concept Tanks liner crew, and keeps the system accessible for clean-outs and desludging.
Concept Tanks designs, fabricates, installs and tests every liner in-house under its own quality assurance (QA) regime, with no third-party installers. The full liner surface is spark-tested on every installation, seam samples are taken every 300 m for destructive testing, and repairs are validated on calibrated in-house equipment.
The dual-liner configuration enables the LDS, which monitors the interstitial space between the primary and secondary liners. A primary liner breach is identified before fluid reaches the ground.
See also: Compliance Assurance ↗

Fluids and Application
The Concept Tank™ stores regulated and industrial liquids across seven major sectors:
Leachate Storage
Produced Water Storage
Brine Storage
Evaporation and storage.
Industrial Process Fluids Storage
Raw Water Storage
Regulatory containment and overland flow.
Potable Water storage
Food-grade liner specification for municipal and remote sites.
Data Centre Water
Cooling water supply, fire water and blowdown storage.
Best for
High volume requirements
Large water storage tanks from 1 ML– 78 ML per system, multi-tank scaling to any project requirement.
Tight Timelines
1–7 weeks from site-ready.
Regulated Fluid Storage
Leachate, produced water, brine, process fluids, raw water.
Constrained Sites
High groundwater, limited excavation access, proximity to waterways.
Uncertain Project Timelines
Fully relocatable, no stranded asset risk.
High Compliance Exposure
Dual liner system with end-to-end control, integrated leak detection system.
The Concept Range
| Concept AST™ | Concept Tank™ | Concept Utility Tank™ | |
| Best for | Short- to medium-term, emergency and rental storage | Large, regulated storage that may grow, shrink or move | Permanent, high-capacity storage on a tight footprint |
| Capacity per system | 0.6 ML–14.5 ML | 1 ML–78 ML (200 ML+ multi-tank) | 12 ML–70ML |
| Structure | Bolted steel panels | Precast concrete panels on steel posts | Lined precast concrete panels |
| Construction time (after site prep) | 1–6 days | 1–7 weeks | 3–4 months |
| Structure design life | Up to 5 years, on condition | 25-years+ | Up to 100 years |
| Foundation | Earthen pad, ≥100kPa | Earthen pad | Concrete ring beam |
| Specific gravity | Up to 1.2 (higher on request) | Up to 1.2 (higher on request) | Up to 1.2 (higher on request) |
| Relocatable | Yes | Yes | No |
| Leak Detection System | Standard | Standard | Standard |
| Solution pathway | Rapid Deployment, Adaptability | Adaptability, Rapid Deployment, Compliance Assurance | Compliance Assurance |
Technical Specification
| Capacity | 1 ML–78 ML per system; 200 ML+ in multi-tank configurations |
|---|---|
| Structure | Tilt-up precast concrete panels on steel posts, with a post-tensioned cable system |
| Liner | Dual-layer liner system with conductive geotextile and Leak Detection System, specified to the fluid |
| Structure design life | 25-years+ |
| Liner design life | 20 years (conditional pro rata manufacturer's warranty) |
| Build time | 1–7 weeks from site preparation completion |
| Construction method | Precast panels and steel posts erected on site; liner installed and QA tested by Concept Tanks' in-house team |
| Specific gravity | Up to 1.2 (higher on request) |
| Foundation | Hardened earthen pad with inverted conical base; no concrete foundations required. |
| Wind load | Regional wind speed compliant |
| Design standards | See Compliance Assurance ↗ |
| Liner QA and testing | Air lance seam testing; destructive seam sampling; vacuum box testing of extrusion welds; full-surface spark testing. Hydrostatic testing available on request |
| Relocatable | Yes |
Configuration Option
- Leak Detection SystemSTANDARD
- Custom PipeworkSTANDARD
- BallastSTANDARD
- SCADA System/Remote MonitoringADD - ON
- Engineered Floating CoverADD - ON
- Viewing PlatformADD - ON
- Overflow WeirADD - ON
- Bird NettingADD - ON
- Anti-climb ProtectionADD - ON
Proven in the field
Concept Tanks has supplied fluid storage to Australia's energy sector for over 17 years. That includes nearly 200 brine systems and 30+ brine concentrate systems on CSG and onshore oil and gas sites. We manufacture in Australia and install with our own crews. That means faster mobilisation and no handover between contractors.
Scalable Brine Evaporation
An oil & gas customer experienced rapid operational growth and increasing volumes of environmentally sensitive brine, necessitating secure storage and evaporation. Unclear total storage requirements resulted in planning uncertainty. An existing dam provided...
Pilbara Dust Suppression Storage
The Pilbara presented a relentless construction environment: mini-tornado whirlwinds, oppressive heat, strong winds, cyclone alerts, and high-UV exposure throughout the program. Iron ore dust, nicknamed the "Pilbara Fog", blanketed the zone continuously, intensified...
Dynamic Brine Services
Our customer in the Oil & Gas industry required secure on-site water storage system for contaminated flowback water to avoid the chance of discharge of contaminated water, which was essential in managing costs in relation to their gas production and frack pilot...
Frequently asked
questions
Common questions about the Concept Tank, Utility Tank, and Concept AST range.
How big can a Concept Tank™ be?
Each system holds 1 ML–78 ML. Multi-tank setups take storage past 200 ML for increased fluid or staged/distributed storage.
Can a Concept Tank™ be expanded, reduced or relocated?
Yes. Add or remove panels to expand or reduce, and relocate the system as project locations or requirements change.
How long does installation take?
1–7 weeks from site preparation completion, depending on system size.
Does the Concept Tank™ need concrete foundations?
No. The system sits on a hardened earthen pad with minimal earthworks.
Can I rent a Concept Tank™?
The Concept Tank™ is available to buy outright, as a long-term rental, or as a long-term rental with a buy-out option. See Ways We Work for every delivery and commercial option.
What fluids can the Concept Tank™ store?
Leachate, produced water, brine, industrial process fluids, raw water and potable water, up to specific gravity (SG) 1.2 as standard and higher on request.
Discuss your requirements
Concept Tanks delivers modular above-ground fluid storage from 1 ML to 78ML per system, scaling to 200 ML+ across multi-tank configurations. It’s operational in 1–7 weeks with no major earthworks. Reconfigure, expand, and relocate as your project moves across waste, oil and gas, mining, industrial, and water sites. If you are storing regulated or environmentally sensitive fluids, contact us to see whether your site is suited to a Concept Tank™. Solving tomorrow's problems, today.