The Pilbara presented a relentless construction environment: mini-tornado whirlwinds, oppressive heat, strong winds, cyclone alerts, and high-UV exposure throughout the program. Iron ore dust, nicknamed the “Pilbara Fog”, blanketed the zone continuously,...
Our heavy industrial customer needed containment for potential overland flow and stormwater, which increased the risk of containment failure because of its proximity to waterways and port facilities. The unlined dam risked seepage and lacked surge capacity during high...