WATER STORAGE, OPERATIONAL IN DAYS.
Rapid Deployment
A looming compliance deadline, an approaching weather event or a failed asset can leave no time for a conventional build. Concept Tanks delivers engineered storage operational within days, not after a six-month construction program.
Concept Tanks deploys relocatable storage from 0.6 ML to 78 ML, with no piling, minimal earthworks and full liner quality assurance (QA) before commissioning.
Since 2009, Concept Tanks has installed 400+ systems across Australia and North America.
Emergency Response
A compliance breach, containment failure or natural event requires storage immediately, with no time for a build program.
Concept Tanks maintains an inventory of Concept AST™ (Above-ground Steel Tank) relocatable steel systems from 0.6 ML to 14.5 ML, available for rapid deployment across Australia. The systems are trailer-deployable and require no grid power. Once the pad is prepared, systems up to 4.6 ML can be holding fluid in under two days.
In-house liner fabrication removes third-party lead times from the response. Demobilisation takes 1 to 3 days, and the asset redeploys to the next site rather than sitting idle as a stranded cost.

Expedited Timelines
A fixed handover date that a conventional build cycle cannot meet, from resource projects to data centre construction and commissioning water.
The Concept Tank™ delivers 1 ML to 78 ML using tilt-up precast concrete panels, operational in 1 to 7 weeks after civil pad preparation.
An inverted conical earthen base replaces bulk excavation and piling, reducing upfront cost, approval scope and end-of-life remediation. Panels and liners are fabricated off-site while pad works proceed in parallel.

Remediation Timelines
Ageing dams, ponds and legacy storage all come offline eventually, and the resulting production pause often costs more than the replacement works.
Temporary containment is installed alongside the existing asset, fluid is transferred, and remediation proceeds without production pressure. A standard Leak Detection System (LDS) and full-surface spark testing give the interim storage the same containment assurance as permanent infrastructure, reducing the risk of approvals delaying the program.
Rent. Buy.
Rent with a Buy-out Option.
The Concept AST™ is available to rent, buy or with buy-out options on a rental arrangement. Our sizes and configurations interchangeable as requirements change. Buy-out options allow storage to begin as operating expenditure and convert to a capital asset once project funding is approved. Renting also avoids owning a single-purpose asset that sits idle between campaigns. The Concept Tank™ is available to buy, as a long-term rental, or as a long-term rental with a buy-out option.
Which tank suits your project
Provide the required volume, fluid type, site conditions and target operational date to receive a tailored recommendation.
|
Concept AST™
|
Concept Tank™
|
Concept Utility Tank™
|
|
| Capacity per tank | 0.6 to 14.5 ML | 1 to 78 ML | 12 to 70 ML |
| Structural design life | Up to 5 years, subject to condition | 25-years+ | Up to 100 years |
| Build Time | 1 to 6 days | 1 to 7 weeks | 3 to 4 months |
| Relocatable | Yes | Yes | No |
| Best For | Emergency response, short campaigns | Larger volumes on expedited programs | Permanent storage on constrained sites |
Fluids we contain
Every system in the range stores fluids up to specific gravity (SG) 1.2 as standard, with higher SG available on request. Liner specifications are matched to fluid chemistry and asset service life.
- Leachate
- Produced water
- Brine
- Mine-affected water
- Industrial process fluids
- Data centre cooling and fire water
- PFAS-affected water
- Potable water
- Raw water
- Stormwater
- Dust suppression water
Proven in the field
Rapid Remediation Fluid Storage
Remediation runs on a simple sequence. Treating contaminated earth includes treating contaminated groundwater. You can’t start treating contaminated groundwater without suitable storage. Storage sits on the critical path of remediation projects where downstream...
Rethinking Frac Fluid Storage In Australia
Frac water management is logistically complex. Remote sites, variable conditions, and strict project schedules mean any delay in water delivery can increase standby costs and disrupt operations. A recent project required 14.5ML of temporary storage capacity for a...
Dynamic Brine Services
Our customer in the Oil & Gas industry required secure on-site water storage system for contaminated flowback water to avoid the chance of discharge of contaminated water, which was essential in managing costs in relation to their gas production and frack pilot...
Frequently asked
questions
How fast can a temporary water storage system be operational?
Once the earthen pad is built to specification, steel systems up to 4.6 ML are holding fluid in under two days. Precast systems from 1 ML to 78 ML take 1–7 weeks depending on volume.
What site preparation is required?
An earthen foundation to the Concept Tanks standard drawing. No piling.
Does a fast install compromise containment integrity?
No. Every liner goes through the same QA regardless of program length, including air lance seam testing and full-surface spark testing.
Can the Concept AST™ be moved once the emergency passes?
Yes. Demobilisation takes 1–3 days.
Mobilise. Contain. Demobilise.
Share your timeline and fluid restrictions, and we'll help you choose the right rapid storage solution for your project.