Rethinking Frac Fluid Storage In Australia

by Koby Tunney | Nov 10, 2026

Concept AST™ on a dirt pad at a Fracturing site.
PROJECT

14.5ML Concept AST™
Hydraulic Fracturing Program

LOCATION

Queensland

APPLICATION

Fresh Water and Flowback Water Storage

TIMEFRAME

< 2 Weeks

Summary

<p>Managing frac water is a logistical challenge for oil and gas projects in Queensland and the Northern Territory, with tight schedules and strict standards.</p>
<p>When a major operator required rapid, compliant storage for fresh and flowback water, the Concept AST™ (Above-ground Steel Tank) delivered. Its robust steel construction, high capacity, and compact footprint reduced site impact and rehabilitation needs. Quick installation and redeployment kept the project moving. Available for hire or purchase, the Concept AST™ streamlined operations, maintained compliance, and lowered long-term costs for operators.</p>

Frac water management is logistically complex. Remote sites, variable conditions, and strict project schedules mean any delay in water delivery can increase standby costs and disrupt operations.

A recent project required 14.5ML of temporary storage capacity for a hydraulic fracturing program, a common requirement for operations in Queensland and the Northern Territory. The objective was to provide reliable storage for both fresh water and flowback within the defined project schedule.

Managing flowback water is complex because it contains dissolved salts, hydrocarbons, and chemical additives. Storage systems must comply with stringent standards. Many temporary tanks are not certified for both fresh and flowback water and frequently lack secondary containment provisions.

Conventional storage solutions such as turkey nests require significant regulatory approvals and earthworks, causing site disturbance and additional rehabilitation costs.

Solution

This Concept AST™ incorporates a 3.67m high steel wall and delivers 14.5ML of storage capacity within a compact footprint. This configuration reduces site clearing, minimises gravel requirements, and lowers rehabilitation liabilities, providing both operational and environmental benefits.

The tank is constructed with a double-liner system and integrated Leak Detection System, which continuously monitors the interstitial space. This configuration enables verifiable and auditable containment, meeting stringent standards for both fresh and flowback water storage.

A clearly visible depth marker provides a consistent and accurate reference point for water managers and supervisors, eliminating the requirement for complex level instrumentation or calibration procedures.

The Concept AST™ is engineered for mobility. The Leak Detection System is specified to maintain performance through multiple redeployments, enabling tanks to be relocated efficiently between sites without extended recommissioning periods.

Outcomes

Concept’s rapid mobilisation saw installation crews on site within 14 days of project award, with the storage system fully installed and operational in less than four weeks. Following project completion, the tanks will be demobilised and prepared for redeployment, maximising asset utilisation across future sites.

The complete Concept AST™ range is available for hire or purchase throughout Australia. All configurations provide the same advanced safety and performance features, regardless of procurement method. The service offering includes delivery, installation, relocation, and removal, supporting operational flexibility, OPEX-based expenditure, and minimisation of residual asset and rehabilitation liabilities.

Contact our oil and gas team today to discuss how Concept AST solutions can optimise your next frac campaign.

Relevant Resources