1.4ML Concept AST™, installed with a floating cover.
PROJECT

1.4ML Concept AST™
Leachate Storage

LOCATION

Queensland

APPLICATION

Landfill

TIMEFRAME

5 Days

Summary

<p>A Queensland Council needed fast, compliant leachate storage without halting landfill operations. Facing growing volumes, wet-weather risk, and a tight budget. The Council required a solution that could be procured, delivered, and operationalised without delay.</p>
<p>Concept Tanks delivered a 1.4ML Concept AST™ with an Engineered Floating Cover and double-lined liner system in just 5 days. Zero leaks. Zero downtime. Zero additional leachate generation</p>

Leachate volumes at this local Queensland Council's landfill exceeded storage capacity, posing serious operational risks during peak wet periods. The landfill had to stay fully functional, so any solution needed to be implemented without interrupting site operations.

With budget restrictions limiting available capital, the Council needed a leachate storage solution that could meet compliance requirements without a significant upfront investment.

Solutions

To address these requirements, Concept Tanks supplied a 1.4 Megalitre Concept AST™ (Above-ground Storage Tank) under a rental agreement, on an ongoing monthly hire basis. This eliminated uncertainty around long-term planning and gave the council time to conduct a thorough investigation while preserving containment performance. Concept's skilled site team had the entire system up and running in 5 days, keeping landfill operations uninterrupted throughout.

Concept installed an Engineered Floating Cover to divert rainwater from stored leachate, directly addressing the generation problem rather than merely storing it. A double-lined system with integrated leak detection ensured the containment certainty required for regulatory compliance.

Outcomes

Concept Tanks provided a high-flexibility rental model that allowed the Council to maintain site operations without a massive capital outlay. This approach was paired with a strategic focus on addressing the root cause: eliminating additional leachate generation by preventing rainfall from entering open storage. By bypassing the lead-time and financial barriers of permanent infrastructure, the rental solution offered a rapid, inventive fix that stabilised the site’s water balance while allowing the Council the operational room to implement long-term source-reduction strategies.

The Council now has 1.4ML of leachate storage with a system that prevents further generation. The double-lined containment has recorded zero leaks to grade, strengthening site compliance from day one.

All objectives were achieved: the solution was delivered promptly, within procurement thresholds, and without any operational downtime.