Water storage solutions for
your next project
Different problems, one engineered above-ground water storage tank range, and one team behind all of them.
400+
SYSTEMS INSTALLED
0.6ML–78ML
STORED AND RELOCATED
UNDER 2 DAYS
HOLDING FLUID
LINER QA
DONE IN-HOUSE
When Water Storage Becomes the Problem
Storage problems rarely arise in a quiet week. A leachate pond is one storm from overtopping. A gas field is producing more brine than the water balance allowed for. A license review is six weeks out, with no quality assurance (QA) file to show the assessor.
Most of those problems come down to time, change, proof, the asset’s full life, or contracting and funding. Concept Tanks addresses each through a dedicated solution. Select the challenge your project faces to find the right storage approach.
Limitations of earthen dams
An earthen dam commits a site to one volume, one footprint and one location, often years before it is operational. Construction is lengthy, capacity cannot adapt to a changing water balance, and demonstrating containment performance is an obligation that lasts the life of the dam.
Concept Tanks builds above-ground modular fluid storage on a compacted earthen pad, with no piling and minimal earthworks. The Concept Tanks team fabricates, welds and spark-tests every liner before commissioning. Depending on the system, it can be commissioned in days, resized using existing panels, or relocated when the project ends.
Find the solutions to your challenges
The right storage path depends on how much time you have before fluid needs to be held. Choose the scenario closest to your project.

Rapid Deployment
Under 2 days for Concept AST™ (Above-ground Steel Tank) systems up to 4.6ML | 1ML–78ML in 1–7 weeks
A containment failure, an approaching weather event or a handover date a civil build cannot meet. Concept Tanks holds an inventory of Concept AST™ temporary storage systems from 0.6 ML to 14.5 ML, ready to mobilise. For larger volumes, a Concept Tank™ is built with panels and liners fabricated off-site while crews prepare the pad in parallel. Every liner still receives full-surface spark testing, regardless of program length.
Benefits:
- Emergency response
- Meets expedited timelines
- Fits remediation timelines
Adaptability
Diameters from 20m to 175m | Up to 78ML per tank, with more tanks added as the project grows
Projects rarely finish at the volume they started with. The Concept Tank™ sets diameter and wall height independently to suit irregular footprints, and reconfigures larger or smaller using its existing panels.
Build for current volumes, add systems as volumes grow, and relocate when the project moves. In our experience, over-building against an uncertain forecast is the most expensive mistake in fluid storage.
Benefits:
- Relocatable solution
- Fits constrained footprint
- Incremental build options


Compliance Assurance
Leak Detection System as standard | Designed to Australian Standards | QA/QC file at handover
A high water table, an adjacent waterway or a zero-discharge licence turns conventional storage into a liability. Concept Tanks compliant storage sits on a pad above the groundwater, with a dual geomembrane liner, conductive geotextile and Leak Detection System (LDS) as standard. Optional remote telemetry identifies a primary liner breach before any release to ground.
Every system is handed over with a full suite of compliance documentation: signed structural design certificate, liner QA records, as-built drawings and QA/quality control (QC) records, available ahead of any licence review.
Benefits:
- Environmental compliance
- Regulatory approvals
- Risk elimination
Engineering and Asset Services
Early contractor involvement | Whole-of-life studies | Asset transition from dams and ponds
Most of the cost of a storage asset is locked in before anything is built. We join the project team before the design is fixed and cost the full life, including closure. We then manage the asset as part of a fleet, and plan the move from legacy dams and ponds without interrupting operations.
Benefits:
- Early contractor involvement
- Whole-of-life engineering studies
- Asset transition


Ways We Work With You
Supply and install to EPC | Buy, rent, or rent with a buy-out option
The containment performance doesn't change. How we deliver it and how you fund it can. We work across supply and install, design and construct, EPC and work packages under your EPCM. Rental, and rental with a buy-out option, let you commit operationally before you commit capital.
Benefits:
- Flexible delivery models
- Commercial models to suit your capital
- Scope agreed before mobilization
Which solution do you need?
Many sites face more than one constraint. Start with the challenge costing the project the most time or money today, and the Concept Tanks team will work with you to identify the right solution.
| Primary Constraints | Typical Triggers | Typical Sectors | Recommended Systems | |
| Rapid Deployment | Time | Failed asset, storm season, fixed handover date | Waste, remediation, emergency response | Concept AST™, Concept Tank™ |
| Adaptability | Changing volume, footprint or location | Staged mine development, drilling program, constrained site | Oil and gas, mining | Concept Tank™ |
| Compliance Assurance | Licence conditions or consequence of failure | Environmental licence review, high water table, sensitive waterway | Waste, utilities, industrial | Concept Tank™, Concept Utility Tank™ |
| Engineering and Asset Services | The storage decision will outlast the project | The storage decision will outlast the project | All sectors | Concept Tank™, Concept AST™, Concept Utility Tank™ |
| Ways We Work With You | How you contract or fund the storage is the constraint | Concept or feasibility study, ageing dam or pond, storage spread across | All sectors | Concept Tank™, Concept AST™, Concept Utility Tank™ |
Frequently asked
questions
What’s the difference between the Concept Tanks Solutions?
They’re different ways into the same tank range, organised by the problem you’re solving. Rapid Deployment is about time, Adaptability is about change, and Compliance Assurance is about evidence. Engineering and Asset Services covers the full life of the asset. Ways We Work With You covers how we deliver and how you fund it. Many projects touch more than one.
How fast can large water storage be operational?
Once the pad is built to specification, a Concept AST™ takes 1–6 days, and systems up to 4.6ML can be holding fluid in under two days. A Concept Tank™ takes 1–7 weeks depending on volume, and a Concept Utility Tank™ 3–4 months.
How much water storage do I need?
Send us the volume you need now, the volume you might need later and your footprint. If the forecast is uncertain, we’ll usually recommend building for today and laying out the site for the next system.
Can I rent a system instead of buying one?
Yes. The Concept AST™ is available to buy, rent, or rent with a buy-out option, and is often supplied on a rental basis for emergency and short-term work. The Concept Tank™ is available to buy, as a long-term rental, or as a long-term rental with a buy-out option. The Concept Utility Tank™ is purchase only. See Ways We Work for every delivery and commercial option.

